Water Pipeline,

Cass 2 Main Install (1)

Crews at Decker Construction installed over 8,200 lineal feet of 12″ waterline, multiple 12″, 8″, 6″ and 4″ valves for the new main and tie overs to existing mains, installations of 9 new fire hydrants and several bores for road crossings.